We have analyzed various aspects and present a very high level proposal for value generation of the project. Still the following open-items are left unexplored primary due to time limitation or current maturity :
Safety and insurance of infra
Various optimization like super-Capacitors & fuel cells
Various Token lifecycles like ubiquitous utility token based fee-less, micro-payments
Covid-19 , carbon economy and impact US election results (Biden’s victory) are also untouched.
Transmission losses & other inherent facets like grid islanding, protection , etc;
There are too many algorithms , mostly theoretical and our current maturity level is not enough to evaluate anyone .
Detailed Profit & loss analysis ,Revenue lines, cost control mechanisms , in-depth risk analysis, cash flows and ROI are not explored in depth.
IP Disclaimer
This section formally recognizes the release of intellectual property rights, if any, from either team mates or GBC.The future of the project’s success, is riddled with so many extrinsic factors that, its safest to presume the path of opensourcing will be most desireable ,leading it to be beneficial if not in India then maybe somewhere else.